Skip to content
Demo Not connected — no account, no network, no saved data. Every change resets on reload. Fictional sample content
Hearthline Builders Today

Today

Wednesday · 4 sites live, 3 items need a call before the 07:30 pour window.

Sites live
4of 8 projects
Crew on site
27
Inspections booked
2
Open queries
52 blocking

Site board

Demo data
07:00
07:30
09:00
10:30

No crew movement scheduled

11:00
13:00
15:00

Needs attention

4
Slab pour at Hollowbrook is weather-held

Ground temperature is below the mix spec. The frame crew behind it cannot start until the pour clears.

3 trade partners have not confirmed tomorrow

Bright Fen Roofing, Vellum Plaster Co, and Ridge Glass Studio are unconfirmed for the Thursday sequence.

Frame inspection at Ashcombe is not lodged

The milestone gate needs an inspection slot before the next draw can be submitted.

2 draw requests overdue

Totalling $70,600 across two projects — oldest sits at 19 days.

Schedule

Week of 21–27 September. Colour marks confirmation state only, never the trade or the site.

Demo data
Time
Mon21
Tue22
Wed23 · today
Thu24
Fri25
Sat26
Sun27
07:00
09:00
11:00
13:00
15:00

Projects

Every live build and its current stage. Select rows for bulk actions, or open a project for the full record. Press / to jump to the filter.

Demo data
8 of 8 projects
Projects, sortable and filterable. Demo data only.
Stage Site lead Status
New build · timber frame
Frame Wren Ostro 3 of 7 $486,000 On site
Conversion · stone shell
Roof & dry-in Ivor Pell 2 of 7 $312,000 On site
Terrace of four · masonry
Rough-in Wren Ostro 5 of 7 $640,000 On site
New build · brick and slate
Pre-start Unassigned 0 of 7 $228,000 Pre-start
Restoration · stone and oak
Pre-start Ivor Pell 0 of 7 $395,000 Pre-start
Extension · glazed link
Snagging Wren Ostro 7 of 7 $174,000 Snagging
Restoration · lime render
Snagging Ivor Pell 6 of 7 $251,000 Snagging
New build · paused
Held Unassigned 1 of 7 $118,000 On hold

Milestones

The standard stage set a contract is broken into. Durations are illustrative sequencing figures, not commitments, and each share is the portion of contract value a draw may be raised against.

Demo data
8 of 8 milestones
Milestone set, sortable and filterable. Demo data only.
Phase Gate
Structure 18 days 15% Inspection
Structure 22 days 20% Inspection
Envelope 12 days 10% Engineer
Envelope 16 days 10% Internal
Fit-out 14 days 10% Inspection
Fit-out 20 days 15% Internal
Fit-out 15 days 20% Engineer
Envelope — 0% Superseded

Trades & subs

Subcontractors booked against the current programme. Document state is illustrative paperwork tracking for the demo, not a real compliance record.

Demo data
6 of 6 trade partners
Trade partners, sortable and filterable. Demo data only.
Today Documents
Excavation & slab
Hollowbrook · 07:30 5 3 Current
Carpentry & frame
Hollowbrook · 07:00 6 1 Current
First and second fix
Quarry Lane · 07:30 4 2 Expiring
Slate & covering
Thu · Ashcombe 3 4 Current
Lime render & linings
Thu · Elder Row 2 6 Missing
Glazing & screens
Not booked 0 0 Expiring

Draws

Milestone draw requests and their state. No payment processor, bank connection, or lender link exists in this demo.

Demo data
Released this month
$107,250
Submitted
$77,4003 requests
Overdue
$70,6002 requests
9 of 9 draw requests
Draw requests, sortable and filterable. Demo data only.
Project Milestone State
Hollowbrook Timber frame 4 Sep 2026 $48,200 19 days outstanding
Ashcombe Roof & dry-in 12 Sep 2026 $22,400 11 days outstanding
Quarry Lane Services rough-in 18 Sep 2026 $31,000 Awaiting inspection
Hollowbrook Windows & cladding 21 Sep 2026 $27,500 Under review
Sable Court Kitchen & finishes Today $18,900 Lodged
Hollowbrook Foundation 14 Aug 2026 $36,150 Released
Ashcombe Foundation 21 Aug 2026 $29,800 Released
Quarry Lane Timber frame 29 Aug 2026 $41,300 Released
Sable Court Plaster & joinery Not lodged $12,750 Draft

Settings

Every value below is display-only in this demonstration. Nothing is editable, saved, or transmitted.

Demo data

No account exists. This admin has no authentication surface, no user records, no stored secrets, and no connected service. It is a layout demonstration for a fictional building firm and intentionally omits every access-control screen.

Firm

Firm name

Shown in the client-facing site header and on draw paperwork.

Hearthline Builders
Site hours

Drives the schedule grid bounds and the first crew movement of the day.

Mon–Fri · 07:00–16:30
Programme increment

Smallest block the schedule grid will place a crew into.

Half day
Draw basis

How a draw request is generated from the milestone set.

Milestone completion · 10% retention

Appearance

Theme

Light is the default. The toggle is session-only — reloading returns to light.

Accent colour

Inherited from the template manifest. Appears in chrome only, never on data.

#a95f39

Integrations

Accounting

No ledger is connected. Draw amounts are illustrative figures only.

Not connected
Scheduling

No programme or Gantt service is linked. The schedule grid is static markup.

Not connected
Messaging

Confirmation and chase actions are simulated locally and send nothing.

Not connected
Analytics

No tracking, telemetry, or third-party script is loaded.

Not connected