Today
Wednesday · 4 sites live, 3 items need a call before the 07:30 pour window.
- Sites live
- 4of 8 projects
- Crew on site
- 27
- Inspections booked
- 2
- Open queries
- 52 blocking
Site board
Demo dataNo crew movement scheduled
Needs attention
4Ground temperature is below the mix spec. The frame crew behind it cannot start until the pour clears.
Bright Fen Roofing, Vellum Plaster Co, and Ridge Glass Studio are unconfirmed for the Thursday sequence.
The milestone gate needs an inspection slot before the next draw can be submitted.
Totalling $70,600 across two projects — oldest sits at 19 days.
Schedule
Week of 21–27 September. Colour marks confirmation state only, never the trade or the site.
Projects
Every live build and its current stage. Select rows for bulk actions, or open a project for the full record. Press / to jump to the filter.
| Stage | Site lead | Status | ||||
|---|---|---|---|---|---|---|
| HF New build · timber frame |
Frame | Wren Ostro | 3 of 7 | $486,000 | On site | |
| AB Conversion · stone shell |
Roof & dry-in | Ivor Pell | 2 of 7 | $312,000 | On site | |
| QL Terrace of four · masonry |
Rough-in | Wren Ostro | 5 of 7 | $640,000 | On site | |
| MD New build · brick and slate |
Pre-start | Unassigned | 0 of 7 | $228,000 | Pre-start | |
| RM Restoration · stone and oak |
Pre-start | Ivor Pell | 0 of 7 | $395,000 | Pre-start | |
| SC Extension · glazed link |
Snagging | Wren Ostro | 7 of 7 | $174,000 | Snagging | |
| ER Restoration · lime render |
Snagging | Ivor Pell | 6 of 7 | $251,000 | Snagging | |
| TG New build · paused |
Held | Unassigned | 1 of 7 | $118,000 | On hold |
Milestones
The standard stage set a contract is broken into. Durations are illustrative sequencing figures, not commitments, and each share is the portion of contract value a draw may be raised against.
| Phase | Gate | ||||
|---|---|---|---|---|---|
| Structure | 18 days | 15% | Inspection | ||
| Structure | 22 days | 20% | Inspection | ||
| Envelope | 12 days | 10% | Engineer | ||
| Envelope | 16 days | 10% | Internal | ||
| Fit-out | 14 days | 10% | Inspection | ||
| Fit-out | 20 days | 15% | Internal | ||
| Fit-out | 15 days | 20% | Engineer | ||
| Envelope | — | 0% | Superseded |
Trades & subs
Subcontractors booked against the current programme. Document state is illustrative paperwork tracking for the demo, not a real compliance record.
| Today | Documents | ||||
|---|---|---|---|---|---|
| OG Excavation & slab |
Hollowbrook · 07:30 | 5 | 3 | Current | |
| KS Carpentry & frame |
Hollowbrook · 07:00 | 6 | 1 | Current | |
| AE First and second fix |
Quarry Lane · 07:30 | 4 | 2 | Expiring | |
| BF Slate & covering |
Thu · Ashcombe | 3 | 4 | Current | |
| VP Lime render & linings |
Thu · Elder Row | 2 | 6 | Missing | |
| RG Glazing & screens |
Not booked | 0 | 0 | Expiring |
Draws
Milestone draw requests and their state. No payment processor, bank connection, or lender link exists in this demo.
- Released this month
- $107,250
- Submitted
- $77,4003 requests
- Overdue
- $70,6002 requests
| Project | Milestone | State | ||||
|---|---|---|---|---|---|---|
| Hollowbrook | Timber frame | 4 Sep 2026 | $48,200 | 19 days outstanding | ||
| Ashcombe | Roof & dry-in | 12 Sep 2026 | $22,400 | 11 days outstanding | ||
| Quarry Lane | Services rough-in | 18 Sep 2026 | $31,000 | Awaiting inspection | ||
| Hollowbrook | Windows & cladding | 21 Sep 2026 | $27,500 | Under review | ||
| Sable Court | Kitchen & finishes | Today | $18,900 | Lodged | ||
| Hollowbrook | Foundation | 14 Aug 2026 | $36,150 | Released | ||
| Ashcombe | Foundation | 21 Aug 2026 | $29,800 | Released | ||
| Quarry Lane | Timber frame | 29 Aug 2026 | $41,300 | Released | ||
| Sable Court | Plaster & joinery | Not lodged | $12,750 | Draft |
Settings
Every value below is display-only in this demonstration. Nothing is editable, saved, or transmitted.
No account exists. This admin has no authentication surface, no user records, no stored secrets, and no connected service. It is a layout demonstration for a fictional building firm and intentionally omits every access-control screen.
Firm
Shown in the client-facing site header and on draw paperwork.
Drives the schedule grid bounds and the first crew movement of the day.
Smallest block the schedule grid will place a crew into.
How a draw request is generated from the milestone set.
Appearance
Light is the default. The toggle is session-only — reloading returns to light.
Inherited from the template manifest. Appears in chrome only, never on data.
Integrations
No ledger is connected. Draw amounts are illustrative figures only.
No programme or Gantt service is linked. The schedule grid is static markup.
Confirmation and chase actions are simulated locally and send nothing.
No tracking, telemetry, or third-party script is loaded.